Union Cabinet Greenlights Bengaluru Namma Metro Phase 3; Orange Line To Start By 2029 | Route Details

12

  • Home
  • Karnataka
  • Union Cabinet Greenlights Bengaluru Namma Metro Phase 3; Orange Line To Start By 2029 | Route Details

The Phase-3 of Bangalore Metro Rail Project will add approximately 44.65 km of new metro lines, connecting the western part of Bengaluru that were previously underserved.


Good News Bengaluru

Bengaluru: In a welcome good news for the commuters of Bengaluru Namma Metro, the Union Cabinet, chaired by the Prime Minister Narendra Modi, today approved the Phase-3 of Bangalore Metro Rail Project with two elevated corridors for a length of 44.65 Km with 31 stations

“Corridor-1 from JP Nagar 4thPhase to Kempapura (along Outer Ring Road West) for a length of 32.15 km with 22 stations and Corridor-2 from Hosahalli to Kadabagere (along Magadi Road) for a length of 12.50 km with 9 stations. On operationalisation of Phase-3, Bengaluru city will have 220.20 km of active metro rail Network,” statement said.

Phase-3 of Bangalore Metro Rail Project: Details

The Phase-3 of Bangalore Metro Rail Project represents a significant advancement in the city’s infrastructure development. The Phase-3 acts as a major expansion of the metro rail network in the city, it said.

Phase-3 will add approximately 44.65 km of new metro lines, connecting the western part of Bengaluru that were previously underserved, it stated.

“Phase-3 will integrate key areas of the city which includes Peenya Industrial Area, IT industries on Bannerghatta road and Outer Ring Road, Textile and Engineering items Manufacturing units on Tumkuru Road and ORR, Bharat Electronics Limited (BEL), Major educational institutions like PES University, Ambedkar College, Polytechnic College, KLE College, Dayanandsagar University, ITI etc,” the statement said.

Improved last-mile connectivity to commercial centres, industrial hubs, educational institutions, and healthcare facilities will facilitate better access for residents, it also added.

(With inputs from agencies)



Images are for reference only.Images and contents gathered automatic from google or 3rd party sources.All rights on the images and contents are with their legal original owners.

Aggregated From –

Comments are closed, but trackbacks and pingbacks are open.