Bhairabi-Sairang New Rail Line Project: 93 per cent work done, says Ministry of Railways – Railways News
Indian Railways is working in full swing to strengthen rail infrastructure in the northeast part of the country. Sharing an update regarding the Bhairabi-Sairang New Rail Line (51.38 km) Project, Mizoram, the Ministry of Railways informed that 93 per cent of the work is completed.
On Friday, the ministry via a social media post on X said that 134 (out of 144) bridge works are completed. 12807m (out of 12853m) tunnel work is also done.
Upon completion, the project will not only boost Mizoram’s connectivity and commerce but also stimulate tourism and foster industrial development.
Mumbai-Ahmedabad Bullet Train Progress: NHSRCL sets new pace! Places 290 girders, 380 more to go – Watch here
Railway Budget 2024: Ashwini Vaishnaw says Rs 15,940 crore allocated for Maharashtra projects, 250 new suburban services to be introduced
Indian Railways: 16 out of 102 Vande Bharat Express trains catering to needs of Maharashtra, says Ashwini Vaishnaw
Amrit Bharat Station Scheme: Envisaged transformation of Begumpet railway station is taking shape, says Ministry of Railways
🚉Bhairabi-Sairang New Rail Line (51.38 km) Project, Mizoram
📈Overall Progress: 93%
🌉Bridge Works Completed: 134/144
⛰Tunnels: 12807m/12853mUpon completion:
-Boost Mizoram’s connectivity & commerce
-Stimulate tourism
-Foster Industrial development#RailInfra4NorthEast pic.twitter.com/tgjrcamjmZ— Ministry of Railways (@RailMinIndia) July 26, 2024
Recently, in a related but different development, the ministry shared the status report of the Kharagpur-Adityapur 3rd Line Project. The length of the entire project is 132 km, out of which 121.5 km rail line was commissioned, informed the Ministry of Railways.
After completion, the Kharagpur-Adityapur 3rd Line will benefit steel and power plants along the Howrah-Mumbai Trunk Route, the ministry added.
“Kharagpur-Adityapur 3rd Line Project (132 km). Progress: 121.5 km Rail line Commissioned. Once complete, it will benefit steel & power plants along the Howrah-Mumbai Trunk Route by transporting raw materials & finished products & enhance the operational capacity of the busy section,” said the Ministry of Railways X.
Images are for reference only.Images and contents gathered automatic from google or 3rd party sources.All rights on the images and contents are with their legal original owners.
Comments are closed, but trackbacks and pingbacks are open.